Editing 2014: JWST Delays
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone.
Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 74: | Line 74: | ||
:[There is a positive-quadrant only line graph. The x- axis is labeled 'Current Date' and the y axis is labeled 'Planned Launch Date'. The dates on both of the axes range from 1995 to 2030.] | :[There is a positive-quadrant only line graph. The x- axis is labeled 'Current Date' and the y axis is labeled 'Planned Launch Date'. The dates on both of the axes range from 1995 to 2030.] | ||
:[In the graph are 15 points, starting at (1997,2007) and extending at a slope of a little less than one. The most recent one is labeled 'Now: 2021'.] | :[In the graph are 15 points, starting at (1997,2007) and extending at a slope of a little less than one. The most recent one is labeled 'Now: 2021'.] | ||
− | :[There are two lines on the graph: a red one and a dashed black one. The red one is a regression of the points on the graph. It has a slope of about ⅔. The black one is a line with a slope of one. They intersect at the point (2026,2026), marked by the label 'Late 2026? | + | :[There are two lines on the graph: a red one and a dashed black one. The red one is a regression of the points on the graph. It has a slope of about ⅔. The black one is a line with a slope of one. They intersect at the point (2026,2026), marked by the label 'Late 2026'?] |
:[Caption below the panel:] | :[Caption below the panel:] |